Sign In | Join Free | My fazendomedia.com
China Hebei Huayang Steel Pipe Co., Ltd. logo
Hebei Huayang Steel Pipe Co., Ltd.
Hebei Huayang Steel Pipe Co., Ltd.
Active Member

5 Years

Home > Welded Steel Pipe >

Ssch20 API 5L PSL1 X56 ASTM A53 Hot Finished Welded Tubes

Hebei Huayang Steel Pipe Co., Ltd.
Contact Now

Ssch20 API 5L PSL1 X56 ASTM A53 Hot Finished Welded Tubes

Brand Name : Huayang steel pipe

Model Number : 101.6mm*6.35mm*12m

Certification : ISO API 5L CE

Place of Origin : China

MOQ : 50tons

Price : negotation

Supply Ability : 100000TONS PER MONTH

Delivery Time : 60DAYS

materail : black

outside : 3PE

inside : FBE

end : bevel

test : UT RT

length : 12m

deliver time : days

function : transmission

transport : shipment

Contact Now

Ssch20 API 5L PSL1 X56 ASTM A53 Hot Finished Welded Tubes

Welded Pipe and Tube Market
Welded pipe market drivers are varied by regions. Large and medium welded pipes demand is mainly driven by major pipeline projects. Most pipeline projects have a close relationship with hydrocarbon exploration activities.
Hydrocarbon fuel demand and fuel prices are keys to the demand for welded pipes. In additions, urbanisation is also playing a key role in driving the demand which supports infrastructure for water and sewerage lines, using welded pipes. Other factors which drive welded pipes demand include GDP growth, construction, automotive and chemical industries.
Developments in the Welded Pipe Industry
North-East Asia, North America and Europe show stable demand growth in pipeline developments over the next five years. China announced in 2017 to increase its existing 112,000 km of energy pipelines network to 169,000 km by 2020 and up to 240,000 km by 2025. Japan has been planning to build a 1,500 km pipeline to import gas from Russia.
North America accounts for almost 31,000 miles of planned pipelines out of which 15,279 miles were already under construction as of 2017. One of the ongoing projects in the US is the construction of 600 miles Atlantic Coast pipeline. Nord Stream 2 project is also expected to be completed by 2021. The Middle East and Africa have 4,423 miles of pipeline projects under construction as of 2018, while 4,794 miles of pipeline projects are planned for the future.

Item Details
Type Seamless,ERW,LSAW,SSAW
Standard ASTM A106.ASME SA106,API 5L ,ASTM A53 ,ASME SA53
Grade B,X42,X46,X52,X56,X60,X65
OD 17.1-1422mm (3/8inch-56inch)
WT 1.5-100mm (Ssch20,sch30,STD,Sch40,Sch80,XS,XXS,Sch100,sch120,etc)
Length 1-12.9m random length,or Fixed length( 5.8m,5.85m,6m.11.8m.12m)
Min.Order quantity We can accept 1 pcs/size if we have stock.
Surface 3PE,3PP,FBE,Black painting,Clear oil varnish.or self color,Inorganic zinc rich layer
Ends Plain ends,Bevels.
Payment term TT or LC
Package Bundles or loose
Delivery time Depends on the specific orders,normally 45days

Ssch20 API 5L PSL1 X56 ASTM A53 Hot Finished Welded Tubes


Product Tags:

ASTM A53 Hot Finished Welded Tubes

      

X56 Hot Finished Welded Tubes

      

PSL1 Hot Finished Welded Tubes

      
Best Ssch20 API 5L PSL1 X56 ASTM A53 Hot Finished Welded Tubes wholesale

Ssch20 API 5L PSL1 X56 ASTM A53 Hot Finished Welded Tubes Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Hebei Huayang Steel Pipe Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)